1. Test: After the user box alarm test
should be done as soon as possible.
Experimental methods as follows: DC24V
(non polar) power line connected to the
terminals of alarm lights, alarm lights will
be issued after power strobe light that is
explained qualified products.
2. Installation: with 2-M6 screws through
the mounting foot lights, lights will be fixed
to the wall or ceiling.
3. The cable glands: ⅡB level using
sealing nut clamping ring structure; ⅡC
level stuffing box sealed structure.
4. Wiring: Open the explosion chamber,
the cables are connected to the terminals